Wiring Diagram For Battery Management Control Unit - PE54.10-P-2104DBA
Model 213.016/053/054/216 up to model year 2021 with code ME05 (Hybrid drive 85 kW-94 kW variant (incl. plug-in))
Model 213.050 up to model year 2021 with code ME06 (Hybrid drive 60 kW variant (incl. plugin)) Control unit N82/2, high-voltage battery module A100
| Wiring diagram for battery management control unit | PE54.10-P-2104-97DBA | ||
| Use of wiring diagrams | OV00.01-P-1901-03DBA | ||
| Abbreviations of signal and circuit designations for wiring diagrams | OV00.01-P-1001-28DBA | ||
| Search aid for all electrical components | OV00.01-P-1909DBA | ||
| Location of line and plug connectors | GF00.19-P-1001DBA | ||
| Location of ground points | GF00.19-P-2001DBA | ||
| Location of Z-connector sleeves (line connections in wiring harness) | GF00.19-P-3001DBA |