LEMON Manuals: Even more car manuals for everyone
Home >> Mercedes Benz >> 2016 >> E400 Base, 2D Convertible >> Repair and Diagnosis >> Engine Mechanical >> Blowers, Superchargers & Turbochargers >> Air Intake, Turbocharging - 212 Chassis - 1 Of 2 >> Testing & Repair >> Torque diagram for intake manifold fastening system - AR09.20-P-1310-03AMG

Torque diagram for intake manifold fastening system - AR09.20-P-1310-03AMG

ENGINE 156 

MODIFICATION NOTES

6.8.09 Value changed: bolt, intake manifold to cylinder head   *BA09.20-P-1002-01R 
  Value changed: bolt, intake manifold to cylinder head   *BA09.20-P-1002-01R 
  Value changed: bolt, intake manifold to cylinder head   *BA09.20-P-1002-01R 
INTAKE MANIFOLD

Number Designation Engine 156
BA09.20-P-1002-01R Bolt, intake manifold to cylinder head Stage 1 Nm 10
Stage 2 ∠° 90
Stage 3 ∠° 10
  1. Tighten bolts on the intake manifold in numerical sequence.
    Fig 1: Intake Manifold Bolts Tightening Sequence
    G10240885Courtesy of MERCEDES-BENZ USA