Trailer recognition control unit wiring diagram - PE31.19-P-2101IAB
MODEL 117 as of 11/3/14, 156 as of 11/3/14, 176 as of 11/3/14, 242 as of 11/3/14, 246 as of 11/3/14 with CODE 550 (Trailer coupling) Control unit N28/1
| Trailer recognition control unit wiring diagram | PE31.19-P-2101-97IAB | ||
| Abbreviations of signal and circuit designations for wiring diagrams | OV00.01-P-1001-28IAA | ||
| Use of wiring diagrams | OV00.01-P-1901-03IAA | ||
| Search aid for all electrical components | OV00.01-P-1909IAA | ||
| Location and assignment of line and plug connectors | GF00.19-P-1000IAA | ||
| Location and assignment of ground points | GF00.19-P-2000IAA | ||
| Location and assignment of Z connector sleeves (wiring and plug connectors in wiring harness) | GF00.19-P-3000IAA | ||
| Fuse and relay box, as-built configuration | GF54.15-P-0800KN |