LEMON Manuals: Even more car manuals for everyone
Home >> Mercedes Benz >> 2013 >> S63 >> Repair and Diagnosis >> Electrical >> Body Electrical >> Electrical System, Equipment & Instructions - 221 Chassis - 2 Of 9 >> Testing & Repair >> Remove/install additional battery >> Remove/install additional battery - AR54.10-P-0007SX

Remove/install additional battery - AR54.10-P-0007SX

MODEL 216.3 as of 2.6.08 

MODEL 216.3 with CODE (809) Model year 2009 

MODEL 221.0/1 as of 2.6.08 

MODEL 221.0/1 with CODE (809) Model year 2009 

Shown on model 221 

Fig 1: Identifying Additional Battery Remove/Install Components - Shown On Model 221
G10111124Courtesy of MERCEDES-BENZ USA
REMOVINGINSTALLING Remove/install     
NOTES Notes on battery   AH54.10-P-0001-01A
IMPORTANT Notes on AGM battery   AH54.10-P-0002-01A
1 Unclip fuse box (1) on instrument panel SPECIAL TOOL Fig 2
2 Take out insulation mat (2)    
3 Loosen cover under instrument panel (4) and place to one side with electrical lines connected IMPORTANT Only disconnect the electrical connector of the left front footwell lamp. AR68.10-P-1500SX
4 Unscrew bolt (3)    
5 Remove bracket (5) with additional battery (G1/7) and central gateway control unit (N93) downwards with electrical lines connected    
6 Remove additional battery (G1/7) with electrical lines connected from the bracket (5)    
7 Disconnect electrical connectors (6) from additional battery (G1/7)    
8 Install in the reverse order    
Fig 2: Identifying Long Wedge (115 589 03 59 00)
G07070400Courtesy of MERCEDES-BENZ USA