LEMON Manuals: Even more car manuals for everyone
Home >> Mercedes Benz >> 2013 >> ML350 Base >> Repair and Diagnosis >> Engine Mechanical >> Exhaust >> Exhaust Manifolds, Emission Control - 166 Chassis >> Testing & Repair >> Remove/install exhaust gas recirculation switchover valve - AR14.20-P-7660CD

Remove/install exhaust gas recirculation switchover valve - AR14.20-P-7660CD

ENGINES 651 in MODELS 166, 172, 204, 207, 212, 218, 221 

Shown on model 204.0 

Fig 1: Identifying Exhaust Gas Recirculation Switchover Valve Remove/Install Components - Shown On Model 204.0
G09975000Courtesy of MERCEDES-BENZ USA

Illustrated on model 166.0 

Fig 2: Identifying Exhaust Gas Recirculation Switchover Valve Remove/Install Components - Illustrated On Model 166.0
G09975001Courtesy of MERCEDES-BENZ USA
REMOVINGINSTALLING Remove/install     
1 Remove engine trim panel    
2 Remove exhaust gas recirculation cooler IMPORTANT Place with attached coolant lines to the side and fix in place AR14.20-P-7665CD 
3 Remove screw/bolt (1) and remove bracket (2) Model 166
IMPORTANT Remove bracket (2) complete with the exhaust gas recirculation cooler bypass switchover valve (Y85).
 
4 Remove electrical connector (3) on exhaust gas recirculation cooler bypass switchover valve (Y85)    
5 Detach vacuum hoses (4)    
6 Release and disconnect exhaust gas recirculation cooler bypass switchover valve (Y85) on retaining tab (5)    
7 Install in the reverse order