Remove/install COMAND APS hard drive - AR82.85-P-1001GW
MODEL 463 as of model year 2013/model refinement package 2012
| Remove/install | |||
| Information on preventing damage to electronic components due to electrostatic discharge | AH54.00-P-0001-01A | ||
|
|||
| 1 | Carry out commissioning of hard disk (2) at COMAND controller unit (A40/3) with STAR DIAGNOSIS | When replacing hard disk (2) | AD00.00-P-2000-04A |
| 2 | Remove COMAND controller unit (A40/3) | AR82.85-P-1100GW | |
| 3 | Place COMAND controller unit (A40/3) on an electrostatic discharge (ESD) workplace | ESD protection |
|
| 4 | Remove bolt (1) | ||
| 5 | Remove hard disk (2) upward (arrow) | ||
| 6 | Install in the reverse order | ||
| 7 | Perform function test |