Preparing Wheel Well Panel Front Section - Ar62.20-D-1280-04H
The following operation steps are shown on the left wheel well paneling front section (1) for model 906.733 and must be performed analogously on the right side if damaged.
- Scribe separation line on wheel well paneling front section (1) (area A).
Transfer dimensions from vehicle.
- Grind mating surfaces on wheel well paneling front section (1) down to bare metal in crosshatched areas.
Grind spot weld flanges down to bare metal on both sides.
- Coat insides of spot weld flanges with zinc dust paint.