Replace clutch - AF91.40-P-8000-02A
| Repairing wiring harness using solder connectors | AR00.19-P-0100-09A |
COMMERCIALLY AVAILABLE TOOLS
| Number | Designation |
|---|---|
| WH58.30-Z-1004-20A | Hot-air gun |
On seat side:
- Cut cable off approx. 100 mm downstream of connector.
- Shorten spaghetti by approx. 50 mm as of separation point.
- Carefully slit remaining spaghetti approx. 30 mm in direction of FSS.
- Remove approx. 15 mm of insulation from both cables.
- Install solder connector.
- Twist strands of two cable ends together.
- Position solder connector in center and shrink with hot air blower (soldering).
- Slide spaghetti approx. 50 mm over solder connector and slit spaghetti.
- Wrap textile strap around free area up to coupling.
- Fasten tieout to vacuum line in area of solder connector with adhesive tape.