Prepare bottom rear center section for installation - AR64.20-P-1000-07SX
- Grind mating surfaces on bottom rear center section (1) down to bare metal in cross-hatched areas with
round wire brush consisting of stainless steel (areas A, B, C, D, E, F, G, H, I, J, K and L).
- Grind mating surfaces on mount below taillamp (2) down to bare metal in cross-hatched areas with
round wire brush consisting of stainless steel (areas M, N, O, P, Q, R, S, T, U, V, W, X, Y and Z).
Observe preliminary treatment of surfaces to be bonded.
Observe preliminary treatment of surfaces to be bonded.
Observe preliminary treatment of surfaces to be bonded.