Prepare new parts for main floor front section - AR63.40-P-1180-15T
COMMERCIALLY AVAILABLE TOOLS
| Number | Designation |
|---|---|
| WH58.30-Z-1001-03A | Round wire brush, braided, dia. 70 mm |
WORKSHOP EQUIPMENT
| WE58.40-Z-1001-03A | Drill (electric/pneumatic) |
| WE58.40-Z-1004-03A | Body saw (electric/pneumatic) |
REPAIR MATERIALS
| Number | Designation | Order number |
|---|---|---|
| BR00.45-Z-1001-07A | Zinc dust paint suitable for spot welding | A 000 986 34 42 |
- Measure separation points at main floor according to part remaining in vehicle and mark (areas B and C).
When cutting ensure that the separation point overlaps approx. 25 mm in areas B and C.
- Cut separation points with body saw (area B and C).
- Remove remaining section.
- Grind connection surfaces down to bare metal in shaded areas on both sides.
- Coat insides of spot weld flanges with zinc dust paint.
Courtesy of MERCEDES-BENZ OF NORTH AMERICA.
- Grind connection surfaces down to bare metal in shaded areas on both sides.
- Coat insides of spot weld flanges with zinc dust paint.