Install side portal with portal straightening set - AR60.20-P-1550-01GY
COMMERCIALLY AVAILABLE TOOLS
| Number | Designation |
|---|---|
| WH58.30-Z-1007-06A | Reversible ratchet |
| WH58.30-Z-1010-06A | Socket SW19 for hexagon head screws |
| WH58.30-Z-1026-06A | Screwdriver bit, 8 mm for hexagon socket head screws |
| WH58.30-Z-1001-11A | Double end box wrench, offset, 17 x 19 mm |
| WH58.30-Z-1002-11A | Double end box wrench, offset, 22 x 24 mm |
WORKSHOP EQUIPMENT
| WE58.40-Z-1008-03A | Pneumatic ratchet |
A and B-pillar portal setup
B, C and D-pillar portal setup
The figures show the setup for body work on the A, B, C and D-pillars.
- Install MZ elements,
portal frame,
inspection and welding device and
welding device.
Position and exact setup of the MZ elements are given in the relevant Celette setup plan.
MZ elements
- When installing the MZ elements on the straightening bench, the direction of the arrow on the MZ elements must be observed
- The part numbers for the MZ elements are cast onto the side
Inspection and welding device and
welding device:
- Direction of arrow of
inspection and welding device or of
welding device always in the direction of travel
- The
inspection and welding device and the
welding device on the left side additionally have on "L" next to the arrow
- The position number in combination with the 8-digit reference number (e.g.: 7169.7001), is also the order number for replacement parts
Always setup the right side of the straightening bench analog to the left side.