Reworking body at rear wheel houses - AZ40.10-P-0001-10E
Only with 8.5Jx17 H2 ET 30 with tires 245/40 R 17.
- Fold horizontal sheet metal flange for securing rear apron in rear wheel houses 80° upwards up to approx. 20 mm in front of mounting screw in accordance with bending line (A).
- Grind off upper edge of rear apron and its reinforcement in this area.
Use a plastic mallet to avoid damaging paint.
Carefully heat outer edges of fender to max. 70 - 80 °C using a hot air blower.
Do not overheat paint when warming edges of fender (max. 80 °C).
- Post-preserve wheel houses with underfloor protection and spray adjusted sheet metal flange with body-cavity protection.
- Check clearance between tires and body with fully compressed suspension.
Repair any damage to the paint.