LEMON Manuals: Even more car manuals for everyone
Home >> Mercedes Benz >> 2007 >> C280 Base >> Repair and Diagnosis >> Transmission >> Automatic Trans >> Fluids -- Capacities & Specifications -- 203 Chassis - 2 Of 2 >> Capacities & Specifications >> Preservation instructions - BB00.40-P-0381-00A

Preservation instructions - BB00.40-P-0381-00A

Measures to be taken if vehicles or engines taken out of and restored to service 

Contents: 

  1. Vehicle preservation 
  2. Engine preservation 
  1. 2.1 Temporary storage up to 12 months 
  2. 2.2 Temporary storage for 12 to 36 months 
  3. 2.3 Temporary storage for more than 36 months 
  4. 2.4 For any temporary storage 
  5. Engine dewaxing 
  6. Vehicle dewaxing 
  1. Vehicle preservation 
    1. Thoroughly clean the vehicle, the underbody, the engine and the engine compartment.
    2. The engine compartment must be treated with preservative following engine cleaning.

      IMPORTANT See Specifications for Operating Fluids, sheet 385.4.

    3. Rectify paint damage and treat the paintwork with MB-polish and MB-gloss preserver.
    4. Treat dull spots, discoloration, spots, etc. on the paintwork.

      IMPORTANT Depending on the severity, treat with either MB-paint cleaner, MB-fine polishing paste or MB-polish and MB-gloss preserver. MB-chrome care products (if necessary, also MB-polish or MBgloss preserver) are provided for chrome and anodized parts. Order number for microfilm Z12501..07/Z12502..07.

    5. Mask window, soft top.
    6. Treat paintwork and chrome parts with exterior wax.

      IMPORTANT The vehicle exterior preservation must be removed again after 6 months with standard finish paint and after 11 months with metallic finish paint, otherwise the paint may start to turn matt. At average daytime temperatures of more than 30 °C the preservation must be removed earlier: with standard finish paint after 2 to 3 months and with metallic finish paints after 8 to 9 months. The times specified relate to vehicles parked in the open air and not under a roof.

      For approved wax preservatives see Specifications for Operating Fluids, sheet 385.2/.3/.5.

    7. Spray underfloor with underbody seal.

      IMPORTANT See Specifications for Operating Fluids, sheet 385.1.

    8. Before parking the vehicle, warm up the service brake so that any moisture at the brake disks and brake pads is evaporated.
    9. Whenever possible, park vehicle in a sheltered area.
    10. Secure vehicle using chocks. Release parking brake / spring brake reservoir to prevent the brake linings from rusting solid.
    11. Drain condensation at the compressed air system.

      IMPORTANT Vehicles without compressed air drier.

    12. Apply prescribed lubricant to all lubrication points.

      IMPORTANT See maintenance sheet.

    13. Initiate intermediate lubrication on control unit.

      IMPORTANT Commercial vehicles with central lubrication system. See WIS, FG 57.

    14. Fill grease containers to the top and cover to protect against the sun.

      IMPORTANT Commercial vehicles with central lubrication system.

    15. Increase the tire pressure (approx. 2 bar above the standard pressure) to prevent the tires from becoming flat, or jack up the vehicle to relieve the load on the tires.

      IMPORTANT For maximum pressure, see specification in tire manufacturer's operating instructions.

    16. Cover the tires to protect from sunlight.
    17. Disconnect the negative terminal of the battery to prevent discharging by closed-circuit accessories.
    18. Fully charge the battery and recharge every 3 months or trickle charge with 0.06 A.

      Bracket for clutch release mechanism 

      Fig 1: Bracket For Clutch Release Mechanism
      G04632321

      IMPORTANT A pressure screw M 8 x 65 is required for this.

    19. Disengage clutch so that the clutch lining does not stick.

      IMPORTANT With mechanical clutch operation, a strip must be clamped between the seat frame and the clutch pedal. With hydraulic clutch operation, secure the release lever, and not the pedal, at the clutch housing/bearing bracket of the slave cylinder. If it is not possible to secure the release lever from outside, then the device shown in the following figure must be made for passenger vehicles. Remove slave cylinder and install the device.

      IMPORTANT Not on vehicles with central release bearing.

    20. Check coolant for antifreeze protection, correct as required.
    21. Check window and headlamp cleaning systems for antifreeze protection, correct as required.
    22. Install rubber emergency bumper.

      IMPORTANT Vehicles with hydropneumatic suspension.

    23. Empty water containers, pumps and hoses to prevent freezing.

      IMPORTANT Vehicles with kitchen and lavatory facilities.

  2. Engine preservation 

    Engines in temporary storage are those that are not operated for more than one month.

    This relates to all installed and removed vehicle, industrial and OEM engines as well as new engines, ET and CBU engines.

    IMPORTANT (ET = replacement or spare engines, CBU = completely built- up vehicles from factory)

    Engines should be stored in dry, well-ventilated areas. If this is not possible, then these are severe conditions  , and the specified measures must be carried out after half the time  , i.e. after six months instead of twelve, for example.

    Removed engines must always be protected from direct moisture (rain or splash water) by special measures.

    When the engine is installed, it is expedient to perform the preservation operations at the storage location, because afterwards the engine may no longer be started.

  1. 2.1 Temporary storage up to 12 months 
    1. 24 Clean engine.

      IMPORTANT Removed and industrial engines.

    2. 25.1 Check engine oil level, correct as required.

      IMPORTANT Only if break-in oil as defined by Specifications for Operating Fluids, sheet 223.1 is in engine.

    3. 25.2 Engine - oil and filter change.

      IMPORTANT Only if service oil is in engine. Refill with break-in oil according to Specifications for Operating Fluids, sheet 223.1.

    4. 26 Check coolant level, correct as required.

      IMPORTANT Fill with coolant according to Specifications for Operating Fluids, sheet 310. For removed engines, drain coolant completely.

    5. 27 Remove catalytic converter and replace with a catalytic converter test pipe.

      IMPORTANT Engine with catalytic converter.

    6. 28 Fuel system preservation.

      IMPORTANT To diesel fuel add approx. 10 % break-in oil and to gasoline add approx. 5 % break-in oil. In accordance with Specifications for Operating Fluids, sheet 223.1.

    7. 29 Warm up engine at average rpm and allow to run for approx. 5 to 10 minutes at operating temperature.
    8. 30 Shut off engine.
    9. 31 Fill oil-bath air filter to maximum fill level.

      IMPORTANT Engines with oil-bath air filter only.

    10. 32 Preserve combustion chambers and air compressors as described under 2.2  .

      IMPORTANT For marine transport or preservation in tropical countries.

    11. 33 Remove rust spots from engine.
    12. 34 Grease all treated exterior surfaces and those surfaces where preservation was not applied.

      IMPORTANT Such as the flywheel, belt pulleys, keyway.

  2. 2.2 Temporary storage for 12 to 36 months 

    All measures listed in Sections 2.  and 2.1.  must be carried out. Preservation of the combustion chambers in diesel engines. 

    1. 35.1 Remove glow plugs.

      IMPORTANT On prechamber engines.

    2. 35.2 Remove injectors.

      IMPORTANT On direct-injection engines.

    3. 36 Pour the following quantity of break-in engine oil into each cylinder and operated the starter for approx. 5 s.

      IMPORTANT Passenger car engines BR 600 = 5...8 cm3

      Commercial vehicle engines BR 600 = 8...10 cm3

      BR 300 = 8...10 cm3

      BR 400 and all other diesel engines = 15...20 cm3

    4. 37 Install glow plugs / injectors.

      Preservation of the combustion chambers in gasoline engines. 

    5. 38.1 Detach fuel line running between the fuel tank and the fuel pump.

      IMPORTANT On carburetor engines.

    6. 38.2 Remove fuel pump relay.

      IMPORTANT Engines with CFI-M, CFI-E and LH-SFI injection systems.

    7. 38.3 Disconnect main relay for the power supply to the control unit.

      IMPORTANT Engines with electronic injection.

    8. 39 Start engine and run carburetor empty.

      IMPORTANT On carburetor engines.

    9. 40.1 Detach a cable at the bolt connections of the ignition coil.

      IMPORTANT Engines with coil ignition.

    10. 40.2 Separate electrical connection on ignition control unit.

      IMPORTANT Engines with transistorized ignition.

    11. 40.3 Separate electrical connection on ignition coils.

      IMPORTANT Engines with electronic injection.

    12. 41 Remove air filter.

      IMPORTANT On carburetor engines.

    13. 42 Fill carburetor with break-in engine oil.

      IMPORTANT Except Stromberg carburetors.

    14. 43 Operate starter for approx. 5 s at full throttle.

      IMPORTANT For Stromberg carburetors, inject corresponding quantity of break-in engine oil from oil can into the carburetor.

    15. 44 Unscrew spark plugs.

      IMPORTANT All engines except carburetor engines.

    16. 45 Pour 5...8 cm3 of break-in engine oil into each cylinder and operate starter for approximately 5 s.

      IMPORTANT All engines except carburetorengines.

    17. 46 Clean and install air filter.
    18. 47 Attach fuel line.
    19. 48 Screw in spark plugs.
    20. 49 Connect cable to ignition coil / Plug electrical connector into ignition control unit/ignition coil.
    21. 50 Insert fuel pump relay / Insert main relay for control unit power supply.

      Preservation of air compressors: 

    22. 51 Spray or pour a maximum of 5 cm3 /cylinder of break-in engine oil via the air intake side.
    23. 52 Crank air compressor for approx. 10 revolutions.

      IMPORTANT Do not start engine.

  3. 2.3 Temporary storage for more than 36 months 

    All measures described in Sections 2., 2.1.  and 2.2.  must be repeated after 3 years or after 18 months.

  4. 2.4 For any temporary storage 
    1. 53 Air-seal all engine openings.
    2. 54 Loosen the V-belt and the poly-V-belt.

      IMPORTANT V-belt and poly-V-belt may, however, remain in position. The engine must no longer be started after this.

  5. 3. Engine dewaxing 
    1. 55 Remove all the sealing caps.
    2. 56 Remove preservative.
    3. 57 Tension V-belt/poly-V-belt according to specifications.
    4. 58 Install removed engines and restore connections.
    5. 59 Fill with approved operating fluids or top up to the maximum level.
    6. 60 Empty fuel tank or run tank empty.
    7. 61 Engines which have already undergone the inspection or running in on the test bench (300 km =6 h) must be topped up with approved service oils.

      IMPORTANT Engines that have not been run in on the test bench or have not undergone inspection must be topped up with approved break-in oil.

    8. 62 Warm up the engine to normal operating temperature while monitoring pressure and temperature readings
    9. 63 Replace catalytic converter test pipe with a catalytic converter.
  6. 4. Vehicle dewaxing 
    1. 64 Remove the securing means for the clutch release mechanism/make the clutch operational.
    2. 65 Correct tire inflation pressure.
    3. 66 Lower vehicle and secure with chocks.
    4. 67 Check the charge level of the battery, recharge the battery if necessary. Install or reconnect battery.
    5. 68 Check operation of electrical system.
    6. 69 Check coolant level. If it needs to be topped up, bleed auxiliary heater and check antifreeze mixture ratio.
    7. 70 Remove rubber emergency bumper on vehicles with hydropneumatic suspension.
    8. 71 Check oil level in steering system, engine, transmission and drive axles.
    9. 72 For vehicles that were out of operation for more than 12 months, replace brake fluid.
    10. 73 Check hoses and lines for cracks.
    11. 74 Check air conditioning/automatic air conditioning for proper operation.
    12. 75 Check refrigerant level. To do this, allow the engine to run beforehand for approx. 4 min with the air conditioning switched on.
    13. 76 If the paintwork is coated with exterior wax, remove the wax using a hot-water high-pressure cleaner (at least 85 °C, distance of 20...25 cm) with a biodegradable cleaning agent added. Detergent shampoos based on alkyl sulfonate or alkyl aryl sulfonate are suitable for warm water high pressure washes (pH 6...8, metering quantity: 2...3 %). The tenside/water emulsion must not be disposed of via oil separators, but must be disposed of via an appropriate wastewater pretreatment (e.g. ultrafiltration).
    14. 77 When dewaxing by hand, first spray the waxed surfaces with cleaning agent (dosage: 5...10 %). Wait 5...10 min, then thoroughly spray off the layer of dirt on the wax with a warm powerful jet of water (40...50 °C). The layer of dirt must be removed completely, otherwise the paint may be scratched during further treatment. Rub cleaning agent into the surfaces still coated with wax, painted surfaces must be rubbed with a sheepskin glove or a soft sponge. Using a warm, powerful jet of water (40...50 °C) spray off the dissolved wax.
    15. 78 Vehicles that were not preserved with wax must always be pre- cleaned with hot-water high-pressure cleaning equipment. This will remove large particles of dirt that may cause severe scratches.
    16. 79 If after thorough washing, a rough film, droplets, etc. remain on the paintwork or the trim parts, first try to remove these with MB paint cleaners according to specifications. Dissolve stubborn dirt by carefully washing off with pure benzine, silicone or tar removers (avoid contact with rubber parts, do not use aggressive solvents such as commercially available thinners). Then treat with MB-polish and MB-gloss preserver.
    17. 80 If it is not possible to remove coatings as described, treat the paintwork with polishing paste and buffer.
    18. 81 Test drive vehicle to check the function of the brake system and the steering system.