LEMON Manuals: Even more car manuals for everyone
Home >> Mercedes Benz >> 2006 >> SLK280 Standard >> Repair and Diagnosis >> Body & Frame >> Sun Roof/T-Top/Convertible Top >> Sliding Roof, Soft Top - 171 Chassis >> Testing & Repair >> Remove/install seal at outer top part of C-pillar for Vario roof - AR77.50-P-6766V

Remove/install seal at outer top part of C-pillar for Vario roof - AR77.50-P-6766V

MODEL 171.4 

Fig 1: Identifying Outer C-Pillar Seal Components For Vario Roof (1 Of 3)
G05028640Courtesy of MERCEDES-BENZ USA
Fig 2: Identifying Outer C-Pillar Seal Components For Vario Roof (2 Of 3)
G05028641Courtesy of MERCEDES-BENZ USA
Fig 3: Identifying Outer C-Pillar Seal Components For Vario Roof (3 Of 3)
G05028642Courtesy of MERCEDES-BENZ USA
MODIFICATION NOTES

10.11.04 Repair method updated All steps
REMOVING Remove    
DANGER Risk of injury  caused by body parts being trapped  or crushed  when working on partially open Vario roof (stop mode) or in its closing area as a result of the Vario roof suddenly collapsing Secure Vario roof with a suitable special tool. -
1 Move Vario roof to intermediate position and secure IMPORTANT Position of C-pillar top sections (4) approx. 90°. The upper bolt (2) should be accessible. AR77.50-P-3000-01V 
    SPECIAL TOOL Figure
2.1 Remove cable tie (14) Only when removing right outer C-pillar seal (1).  
3 Unscrew bolts (2)    
4 Remove seal retaining rail (3)    
5 Remove outer C-pillar seal (1) from C-pillar upper section (4)    
CLEANING Cleaning     
6 Remove sealant residues from sealing surface of C-pillar upper section (4) and thoroughly clean sealing surface SPECIAL TOOL The sealing surface should be free of grease and dust. Otherwise leakage is possible.
IMPORTANT Observe drying time for cleaning agent It is not necessary to clean the outer C-pillar seal (1) because it is always replaced after removal
 
    Cleaner *BR00.45-Z-1025-04A 
INSTALLING Install     
7 Install sealing tape (5) on flange of C-pillar top section (4) IMPORTANT Do not touch sealing tape (5) with bare fingers
Position sealing tape (5) in center and fold over approx. 10 mm on both ends. The sealing tape (5) should make contact to the kinked edge (arrow D)
Length of sealing tape (5) approx. 100 mm.
 
    Sealing *BR00.45-Z-1050-01A 
8 Install sealing tape (16) on inner flange corner of C-pillar top section (4) IMPORTANT Do not touch sealing tape (16) with bare fingers
Sealing tape (16) should overlap on sealing tape (5).
Lay sealing tape (16) along edge as shown approx. 10 mm around corner (arrow K).
 
    Sealing *BR00.45-Z-1050-01A 
9 Extend upper stay (6) and lower stay (7) with dia. 8 mm sealant bead (8) to the upper and lower edge (arrow A). IMPORTANT Do not touch dia. 8 mm sealant bead (8) with bare fingers.
SPECIAL TOOL
Fig 4
    Sealant *BR00.45-Z-1048-01A 
10 Lift inner C-pillar seal (11) and install sealant (arrow E) in joint area IMPORTANT Do not touch sealant (arrow E) with bare fingers
Install sealant (arrow E) so that the joint between the outer C-pillar seal (1) and inner C-pillar seal (11) with sealant (arrow E).
 
    SPECIAL TOOL Fig 4
    Sealant *BR00.45-Z-1048-01A 
11 Apply 8 mm sealant bead (9) as shown IMPORTANT Do not touch dia. 8 mm sealant bead (9) with bare fingers. Observe connection of dia. 8 mm sealant bead (9) to dia. 8 mm sealant bead (8) and sealing tape (5)
Apply sealant slightly thicker in area of connections to dia. 8 mm sealant beads (8) and sealing tape (5).
 
    SPECIAL TOOL Fig 4
    Sealant *BR00.45-Z-1048-01A 
12 Starting at outer corner (arrow C) install outer C-pillar seal (1) on C-pillar top section (4) and press sealing tapes (5, 16) and 8 mm sealant beads (8, 9) down over full surface by hand. IMPORTANT Use new outer C-pillar seal (1) Check connection of molded part (10) over entire length of sealing tape (5) by lifting lip (arrow B) Ensure that the outer C-pillar seal (1) makes contact above the outer corner of the C-pillar upper section (4) (arrow C) as shown.  
13 Firmly press on sealing base (12) below C-pillar covering (13) Then ensure that the sealing lug (arrow F) and the inner corner (arrow G) of the molded part (10) are seated correctly.    
14 Position seal retaining rail (3) on outer C-pillar seal (1)    
15 Check whether the outer C-pillar seal (1) is positioned above the inner C-pillar seal (11) (arrow H). If necessary, check whether outer C-pillar seal (1) is seated correctly    
16 Tighten bolts (2) IMPORTANT Tightening sequence from inside toward outside  
    TORQUE SPECIFICATION *BA77.50-P-1004-01A 
17.1 Fasten electric wiring harness (15) with new cable tie (14) to C-pillar top section (4) Only when replacing right outer C-pillar seal (1).  
18 Remove excessive sealant from C-pillar upper section (4)    
19 Remove support for securing intermediate position of Vario roof and close Vario roof SPECIAL TOOL Figure
20 Perform rain test    
HARDTOP

Number Designation Model 171.4
BA77.50-P-1004-01A Screw, seal retaining rail to top part of C-pillar Nm 5
Fig 4: Identifying Hand Pressure Gun (000 589 01 25 00)
G05028643Courtesy of MERCEDES-BENZ USA
Fig 5: Identifying Support (230 589 04 63 00)
G05028644Courtesy of MERCEDES-BENZ USA
REPAIR MATERIALS

Number Designation Order number
BR00.45-Z-1048-01A Sealant A 001 989 31 20
BR00.45-Z-1050-01A Sealing A 170 795 11 98
BR00.45-Z-1025-04A Cleaner A 005 989 19 71