LEMON Manuals: Even more car manuals for everyone
Home >> Mercedes Benz >> 2006 >> ML500 >> Repair and Diagnosis >> Collision >> Dimensions >> Body >> Testing & Repair >> Install side portal with portal straightening set - AR60.20-P-1550 >> Install side portal with portal straightening set - AR60.20-P-1550-01GZ

Install side portal with portal straightening set - AR60.20-P-1550-01GZ

Fig 1: Identifying Portal Frame (129 589 03 23 00)
G05258533Courtesy of MERCEDES-BENZ OF NORTH AMERICA.
Fig 2: Identifying Inspection and Welding Devices (164 589 00 23 00)
G05258534Courtesy of MERCEDES-BENZ OF NORTH AMERICA.
COMMERCIALLY AVAILABLE TOOLS

Number Designation
WH58.30-Z-1007-06A Reversible ratchet
WH58.30-Z-1010-06A Socket SW19 for hexagon head screws
WH58.30-Z-1026-06A Screwdriver bit, 8 mm for hexagon socket head screws
WH58.30-Z-1001-11A Double end box wrench, offset, 17 x 19 mm
WH58.30-Z-1002-11A Double end box wrench, offset, 22 x 24 mm
WORKSHOP EQUIPMENT

WE58.40-Z-1008-03A Pneumatic ratchet

A and B-pillar portal setup 

Fig 3: Identifying A And B-Pillar Portal Setup
G05258535Courtesy of MERCEDES-BENZ OF NORTH AMERICA.

B and C-pillar portal setup 

Fig 4: Identifying B And C-Pillar Portal Setup
G05258536Courtesy of MERCEDES-BENZ OF NORTH AMERICA.

C and D-pillar portal set-up 

Fig 5: Identifying C And D-Pillar Portal Set-Up
G05258537Courtesy of MERCEDES-BENZ OF NORTH AMERICA.

IMPORTANT The figures show the setup for body work on the A, B, C and D-pillars.

  1. Install MZ elements, SPECIAL TOOL portal frame and SPECIAL TOOL inspection and welding device.

IMPORTANT Position and exact setup of the MZ elements are given in the relevant Celette setup plan.

MZ elements 

SPECIAL TOOLInspection and welding device: 

IMPORTANT Always setup the right side of the straightening bench analog to the left side.