Desynchronizing sliding / pop-up roof, function - GF77.20-P-3003GH
MODEL 163 with CODE (414a) Electric glass sliding/pop-up roof
Definition
Desynchronization cancels synchronization of the sliding /pop-up roof, i.e. the counter status for the position measurement is no longer valid.
Function
Desynchronization is accomplished when
- the sliding /pop-up roof (M12) is disconnected from the power supply (e.g. by disconnecting the battery or defective fuse), or
- a malfunction has been recognized in the position measurement or
- the sliding /pop-up roof has been moved with the crank (mechanical emergency actuation).
In such cases the interrelationship between the counter status in the position measurement and the actual position of the sliding /pop-up roof is no longer true. For this reason synchronization is necessary.
In the desynchronized state only limited operation of the sliding /pop-up roof is possible; it is only possible to open the pop-up roof for synchronization .
| Synchronizing sliding/pop-up roof, function | GF77.20-P-3002GH | ||
| Sliding/pop-up roof position measurement, function | GF77.20-P-3001GH | ||
| Convenience control | GF72.29-P-2002GH | ||
| All-activity module, location/purpose/ design/ function | up to 11.99 | GF54.21-P-4100GH | |
| Extended-activity module, location/ purpose/ design/function | as of 12.99 | GF54.21-P-4107GK |