- Screw on connection nut manually until a noticeable resistance be felt.
- Tighten connection nut 1 1/2 turns.
A marking line facilitates checking the number of turns.
- Loosen connection nut slightly to release tension on extinguishing agent line or extinguishing agent pressure hose.
- Tighten nut again until a noticeable resistance is felt clearly and tighten 1/4 turn for final assembly.
Hold with second wrench.
- Completely disconnect connection to check deformation.
A clear raised bead must be visible on the inside of the tubing
- When reinstalling the same fitting, again tighten connection nut until the stop can be clearly felt. For final installation, tighten the fitting another 1/4 turn
When reinstalling, lubricate parts.