Installing instrument - AZ54.65-P-0001-05FA
- Mark hole pattern for display instrument (2) in the right D-pillar trim as shown in the figure and pre-drill to 6 mm dia.
- Rework the mounting hole for display instrument (2) to 30 mm dia.
- Clip display instrument (2) into the side trim as shown in the figure.
- Starting from the display (2) in the right D-pillar trim, route the cable under the rear of the roof trim and stick in place with adhesive felt (arrows).
- Connect the connector of the display (2c) with the wiring harness of the ultrasonic backup assist to the left D-pillar and also fix in position with adhesive felt.
Model 210.2 as of 1.7.99 model year 99