LEMON Manuals: Even more car manuals for everyone
Home >> Mercedes Benz >> 2002 >> E430 Base >> Repair and Diagnosis >> Accessories & Equipment >> Collision/Avoidance >> Backup Assist & Vehicle Log - Retrofitting & Conversion - 210 Chassis >> Retrofitting & Conversion >> Installing instrument - AZ54.65-P-0001-05C

Installing instrument - AZ54.65-P-0001-05C

    Model 210.2 

  1. Mark the center point of the mounting hole for the display instrument on the removed right C-pillar trim as per the diagram.
  2. Make a 30 mm dia. mounting hole at the marked drilling point and clip the display instrument (1) into the trim.
  3. Route the display instrument connection cable downwards when attaching the trim.
  4. Route the connection cable backwards from the C-pillar to the control module installation point in the right of the loading space.

    IMPORTANT Tie connection cable to existing cables or wiring looms. Pay attention to chafe-free routing and attach chafe protection if necessary. Tie back cable if overlength.

    a = 25 mm 

    b = 40 mm 

    Fig 1: Identifying Center Mark Point Of Mounting Hole
    G04633535Courtesy of MERCEDES-BENZ OF NORTH AMERICA.