LEMON Manuals: Even more car manuals for everyone
Home >> Mercedes Benz >> 2001 >> SLK230 Automatic >> Repair and Diagnosis >> Suspension >> Rear Suspension >> Rear Axle -- Testing & Repair -- 170 Chassis - 2 Of 2 >> Testing & Repair >> Remove/install inside CV joint or rubber boots on rear axle shaft - AR35.30-P-0660A >> Inner constant-velocity joint - Dismantling, inspecting for wear, assembly; Rear axle shaft has been reinforced at ball retainer - AR35.30-P-0660-03A

Inner constant-velocity joint - Dismantling, inspecting for wear, assembly; Rear axle shaft has been reinforced at ball retainer - AR35.30-P-0660-03A

Model 129 

    Disassemble 

  1. Mark relative positions of joint ring, joint hub and ball retainer before dismantling using electric scriber or whetting stone.
  2. Swivel joint hub and ball retainer and remove individually in turn.
  3. Remove joint hub and ball retainer from joint ring.
    Fig 1: Identifying Swivel Joint Hub And Ball Retainer
    G04636305
    Fig 2: Identifying Joint Hub And Ball Retainer
    G04636306
  4. Swivel joint hub toward ball cage by 90° and remove.
  5. Clean all parts.
    Fig 3: Identifying Swivel Joint Hub
    G04636307
  6. Check 

  7. Check joint ring, joint hub, ball retainer ball raceways and ball bearings for depressions (pitting) and traces of wear (arrows).

    IMPORTANT If these parts are extremely worn, the entire CV joint must be replaced.

    Smooth areas and tracks caused by the ball bearings are no reason to replace the CV joint.

    Fig 4: Locating Joint Ring, Joint Hub And Ball Retainer Ball Raceways
    G04636308
  8. Assemble 

  9. Place joint hub in vertical position to ball retainer and insert.
  10. Insert one ball bearing, paying attention to the markings on the joint hub and the ball retainer.
  11. Insert joint hub with ball retainer and ball bearings into joint ring, also paying attention to markings (arrow).
    Fig 5: Inserting Joint Hub With Ball Retainer
    G04636309
    Fig 6: Locating Joint Hub In Vertical Position
    G04636310

    If no markings have been made, assemble the joint ring such that the narrow side of the ball raceway always faces the wide side of the joint hub or vice-versa (arrows).

  12. Align the joint hub with the ball retainer to the extent that one ball after the other can be inserted in each case.
    Fig 7: Locating Joint Hub
    G04636311
    Fig 8: Aligning Joint Hub
    G04636312