Remove/install track rod and replacement of rubber mount - AR35.20-P-0112I: Notes
MODEL 215, 220
Shown on model 220 with AIRMATIC
| Remove/install | |||
| Notes on self-locking nuts and bolts | All models | AH00.00-N-0001-01A | |
| Risk of death caused by vehicle slipping or toppling off of the lifting platform. | Align vehicle between the columns of the lifting platform and position the four support plates at the lifting platform support points specified by the vehicle manufacturer. | AS00.00-Z-0010-01A | |
| 1 | Raise vehicle | ||
| 2 | Press track rod joint (4c) out of wheel carrier | AR35.20-P-0109-01I | |
| *BA35.20-P-1002-04A | |||
| Fig 2 | |||
| Figure | |||
| 3 | Remove track rod (4) from rear-axle carrier | ||
| *BA35.20-P-1001-04A | |||
| Figure | |||
| Checking | |||
| 4 | Inspect track rod rubber mount (4b) | If necessary after checking: ↓ | |
| Remove rubber mount of tie rod. | AR35.20-P-0112-01I | ||
| Figure | |||
| Remove/install eccentric rubber mount of tie rod | AR35.20-P-0112-01IA | ||
| Figure | |||
| 5 | Install in the reverse order | ||
| 6 | Adjust rear-axle toe | Models 215, 220 without maximum security package, code Z07 | AR40.20-P-0261I |
| Model Series 220 with maximum security package, Code Z07 | AR40.20-P-0261MB |
| Number | Designation | Model 215 | Model 220 | |||
|---|---|---|---|---|---|---|
| BA35.20-P-1001-04A | Self-locking nut, track rod to rear axle carrier | Stage 1 | Nm | 70 | 70 | |
| Stage 2 | ∠° | - | - | |||
| BA35.20-P-1002-04A | Self-locking nut, tie rod at wheel carrier | yellow M10x1 | Nm | - | - | |
| silver or blue M10x1 | Nm | - | - | |||
| silver or blue M10x1.5 | Stage 1 | Nm | 30 | 30 | ||
| Stage 2 | ∠° | - | - | |||