Home >> Mercedes Benz >> 1998 >> S600 >> Repair and Diagnosis >> Accessories & Equipment >> Wiring System (Data Link Connectors, Pwr Dist., Grnd Dist.) >> Electrical System, Equipment & Instructions - 140 Chassis >> Repair & Adjustments >> Charging, checking the state and capacity of the battery - ra54001401130x(1130)

Charging, checking the state and capacity of the battery - ra54001401130x(1130)

Checking state of charge, B. Charging, C. Load test Model 140 

Operation no. of operation texts and work units or standard texts and flat rates:

  1. Checking state of charge 

    DANGER Pay attention to warning notes and safety precautions (Initial filling of the battery  , A.).

    Fig 1: Checking Electrolyte Level
    G05439032Courtesy of MERCEDES-BENZ OF NORTH AMERICA.
    TEST DATA

    Electrolyte density in kg/dm3 at 20 °C charged 1.28
    semi-charged 1.20
    discharged 1.12
    Visual inspection for external leaks.
    Cell covers unscrew, screw in.
    Electrolyte density measure, min. 1.24 kg/dm3 .
      If the electrolyte density in one or several cells differs from the others by >0.04 kg/dm3 , renew battery.
      Electrolyte density <1.24 kg/dm3 , perform charging battery, perform B.
    Electrolyte level check, top up distilled water if necessary.
      If no fault found, perform load test C.
    COMMERCIALLY AVAILABLE TESTER

    Acidimeter e.g. Hazet
  2. Charging 

    Preliminary work:

    A. Checking state of charge

    Quiescent current retention unit disconnect, connect.
    Battery disconnect, reconnect (Disconnection and connection of the battery  ).
    Battery remove, install.
     
    NOTE: On vehicles with two batteries both batteries must be removed.
    Cell covers unscrew.
    Electrolyte level check, top up distilled water if necessary.
    Cell covers screw in.
      IMPORTANT Use battery charging room due to generation of explosive gas.
    Positive terminal (+) of charger connect to positive pole (+) on battery, disconnect.
    Negative terminal ( - ) of charger connect to negative pole ( - ) of battery, disconnect.
      IMPORTANT On vehicles with two batteries the batteries must be charged separately.
    Charger switch on, switch off. The charging current should be max. 10 % of battery capacity, e.g. max.
    10 A charging current for a 100 Ah battery.
      Note for quick-charging  Unscrew cell caps.
      Maximum charging current for 30 minutes 50 amperes then switch over to normal charging (see above).
    Electrolyte density measure, specification 1.28 kg/dm3 .
    ELECTROLYTE DENSITY

    Electrolyte density in kg/dm3 at 20 °C charged   1.28
      semi-charged 1.20
      discharged 1.12
    NOTE: The electrolyte density is dependent on temperature and varies by 0.01 kg/dm3 for each 15 °C.

    Examples:

    Electrolyte density at 20 °C 1.28 kg/dm3

    Electrolyte density at 35 °C 1.29 kg/dm3

    Electrolyte density at 5 °C 1.27 kg/dm3

    COMMERCIALLY AVAILABLE TESTERS

    Acidimeter e.g. Hazet
    Quiescent current retention unit e.g. Hans Zeheter CMP 12.2
  3. Load test 

    Preliminary work:

    A. Checking state of charge

    Fig 2: Checking State Of Battery Charge
    G05439033Courtesy of MERCEDES-BENZ OF NORTH AMERICA.
    Quiescent current retention unit disconnect, connect.
    Battery disconnect, reconnect (Disconnection and connection of the battery  ).
    Battery remove, install.
    Electrolyte density measure, min. 1.24 kg/dm3 ; if electrolyte density <1.24 kg/dm3 , charge battery
      IMPORTANT On vehicles with two batteries both batteries must be removed and tested separately.
    Load test at 20 °C perform.  
      Capacity/Ah Load current/A
      74 230
      100 300
    Battery minimum voltage check, specification after 10 seconds approx. 10 V or >10 V.
      If specified value is not reached, renew battery.
      If specified value is reached, charge battery.
    Electrolyte density measure, specification 1.28 kg/dm3 .
    COMMERCIALLY AVAILABLE TESTERS

    Acidimeter e.g. Hazet
    Volt/ampere tester with load resistor e. g. Hermann, Electronic
    Quiescent current retention unit e. g. Hans Zeheter CMP 12.2