LEMON Manuals: Even more car manuals for everyone
Home >> Mercedes Benz >> 1998 >> C280 >> Repair and Diagnosis >> Steering >> Power Steering >> Steering -- 202 Chassis >> Testing & Repair >> Attaching and adjusting control cables - AR46.15-P-0550-05A

Attaching and adjusting control cables - AR46.15-P-0550-05A

Attaching and checking 

  1. Attach control cable (93a) with spring
  2. Attach control cable (93b) with spring
  3. Release the play adjusters against the spring force again by turning by hand and allow them to be tightened again by the spring force. Set play adjusters, if necessary. Check setting dimension "a" = 90 mm at both spring cables (93a, 93b) at the hook eyes of the springs.
    Fig 1: Identifying Spring Cables
    G04713848
  4. Adjusting 

  5. Press driver (92a) off the adjusting bush (92b).
    Fig 2: Pressing Driver Off Adjusting Bush
    G04713849
  6. Correct adjustment by turning the driver (92a) towards the adjusting bush (92b).
  7. Attach control cables again and check setting dimension "a".
    Fig 3: Turning Driver Towards Adjusting Bush
    G04713850