Installing tilting/sliding roof panel - AR77.20-P-1000-02EA
Electrically operated steel tilting/sliding roof (code 412b)
TEST AND ADJUSTMENT VALUES FOR TILTING/SLIDING ROOF
| Number | Designation | Model 202 | ||
|---|---|---|---|---|
| BE77.20-P-1001-01A | Joint gap | Front of tilting/sliding roof panel | mm | 0,15 |
| Side and rear of tilting/sliding roof panel | mm | 0,30 | ||
Special tools
- Insert adjustment gauge (7) into holder (8) and arrest in direction of arrow.NOTE: The adjustment gauge (7) ensures that the holder (8) and tilting/sliding roof panel (1) are positioned properly when installed.
- Position tilting/sliding roof panel (1), loosely screw on nuts (3) and screw (4).
- Slightly tension tilting/sliding roof panel (1) with installation pliers (9), tighten nuts (3) and screw (4).
- Remove adjustment gauge (7) and installation pliers (9).
- Check tilting/sliding roof for proper function.
- Check joint gaps around closed tilting/sliding roof panel (1) from outside.