Removal and installation of the air pump belt pulley - ra14lh1047252x(7252)
WARNING: This page does not describe the selected car, but rather 42 other vehicles, including the 1999 Mercedes-Benz S600, 1999 Mercedes-Benz S500, 1999 Mercedes-Benz S420, 1999 Mercedes-Benz S320, and 1999 Mercedes-Benz CL600. However, it is still accessible from the selected car via links, so may be relevant.
Engine 104 LH-injection
Preceding work
Removing and installing air pump (14-7251)
Operation No. of operation texts and operation values or standard texts and flat rates; 14-7252
| Nut (5) | unscrew, screw on; counter-hold with |
| hexagon socket (arrow). Tightening torque 35 5 Nm. |
|
| Circlip (7a) | remove, install. |
| Belt pulley (6) | pull off, fit on. |
NOTE:
A spacer ring (arrow) is installed in front of the bearing and the belt pulley; previously without spacer ring.
PRODUCTION BREAKPOINT: 08/91
| Model | Engine | Engine end no. |
|---|---|---|
| 140.032/33 | 104.990 | 000107 manual transmission 010701 automatic transmission |