Sealing rail on hard top - AR77.50-P-4500A
MODEL 129
Figure 1
Figure 2
Figure 3
Figure 4
| Inspecting | |||
| 1 | Unlock hard top and shim | ||
| 2 | Pull seal out of rail on side of hard top at top (figure 1, arrow) | ||
| 3 | Unscrew screws from rail (3 each) | ||
| 4 | Install long wedge between rail and hard top (figure 2, arrow)) |
Long wedge | Figure |
| 5 | Remove sealant from rail and hard top | ||
| 6 | Apply sealant to rail (figure 3, arrows) | *BR00.45-Z-1007-02A | |
| N | Screw on rail | ||
| 8 | Insert seal into rail on left and right approx. 5 cm | ||
| 9 | Lock hard top | ||
| 10 | Moisten seal and install completely in rail | *BR00.45-Z-1010-06A | |
| 11 | Remove sealant coming out | ||
| 12 | Unlock hard top | ||
| 13 | Slightly pull seal out in corner area of hard top | ||
| 14 | Press sealant in between seal and hard top (figure 4, arrows) | *BR00.45-Z-1007-02A | |
| 15 | Install seal and lock hard top | ||
| 16 | Remove sealant coming out |
REPAIR MATERIALS
| Number | Designation | Order number |
|---|---|---|
| BR00.45-Z-1007-02A | Adhesives | A 005 989 61 71 |
| BR00.45-Z-1010-06A | Antifriction agent | A 000 989 03 67 |