LEMON Manuals: Even more car manuals for everyone
Home >> Mercedes Benz >> 1994 >> C220 >> Repair and Diagnosis >> External Pages >> Different car >> Section 62 (Automatic Transmission - 140 Chassis) >> Testing & Repair >> Loosening or fastening electrical cables at kick-down solenoid valve and at control valve for 5th gear - AR27.50-P-0360-03A

Loosening or fastening electrical cables at kick-down solenoid valve and at control valve for 5th gear - AR27.50-P-0360-03A

WARNING: This page does not describe the selected car, but rather 42 other vehicles, including the 1999 Mercedes-Benz S600, 1999 Mercedes-Benz S500, 1999 Mercedes-Benz S420, 1999 Mercedes-Benz S320, and 1999 Mercedes-Benz CL600. However, it is still accessible from the selected car via links, so may be relevant.

A Loosening 

  1. Loosen fastening screws (139).
  2. Remove electrical cables from kick-down solenoid valve and control valve for 5th gear.

    B Fastening 

  3. Clamp electrical cables below the bracket provided (arrows).
  4. Unscrew electrical cables with the fastening screws (139) at kick-down solenoid valve and at control valve for 5th gear.
    Fig 1: Locating Positions For Clamping Electrical Cables
    G04679396Courtesy of MERCEDES-BENZ OF NORTH AMERICA.