Removing and installing fuel cooler - AR47.00-P-3061F
WARNING: This page does not describe the selected car, but rather 42 other vehicles, including the 1999 Mercedes-Benz S600, 1999 Mercedes-Benz S500, 1999 Mercedes-Benz S420, 1999 Mercedes-Benz S320, and 1999 Mercedes-Benz CL600. However, it is still accessible from the selected car via links, so may be relevant.
ENGINE 120
| Fig. item, etc. | Work instructions | ||
|---|---|---|---|
| Fuel pressure | Release through service valve at fuel rail. See Diagnosis Manual Engine, Volume 2, Index 3.2 |
||
| Fig 2 | |||
| Fig 3 | |||
| Air conditioner | drain (observe recycling instructions) | ||
| Check refrigerant level of air conditioner/automatic climate control, adjust to correct level | see RI Climate Control Model 140 Op. no. 83-8312 | ||
| 75 | Fuel cooler | remove, install |