LEMON Manuals: Even more car manuals for everyone
Home >> Mazda >> 2022 >> CX-5 Turbo Signature >> Repair and Diagnosis >> External Pages >> Different variant/trim >> Section 7 (Engine Mechanical System (VIN M)) >> Cylinder Head Gasket Replacement >> Cylinder Head Installation Note

Cylinder Head Installation Note

WARNING: This page is about a different variant/trim than selected.
  1. Measure the length of the cylinder head bolt.
    • If it exceeds the maximum specification, replace the cylinder head bolt.
      G11429684Courtesy of MAZDA MOTORS CORP.

      Standard cylinder head bolt length 

      145.2-145.8 mm {5.717-5.740 in}

      Maximum cylinder head bolt length 

      146.5 mm {5.767 in}

  2. When a cylinder head bolt is reused, apply engine oil to any part of the following:
    • Bolt seating surface
    • Cylinder head seating surface
    CAUTION:
    • Completely remove oil, dirt, and silicone sealant adhering to the cylinder head gasket contacting surfaces. Otherwise, a sealing malfunction may occur.
  3. Completely remove any oil, dirt, and silicone sealant adhering to the cylinder block.
    CAUTION:
    • Be aware of the following points, otherwise a sealing malfunction may occur due to hardening of the silicone sealant.
      • Set cylinder head on cylinder block within 10 min after silicone sealant is applied
      • After setting cylinder head, tighten cylinder head bolts immediately
  4. Apply silicone sealant (TB1217D or equivalent) to the areas shown in the figure.
    G12188433Courtesy of MAZDA MOTORS CORP.

    Silicone sealant application diameter 

    5-10 mm {0.2-0.3 in}

  5. Install a new cylinder head gasket to the cylinder block.
  6. Apply silicone sealant (TB1217D or equivalent) to the areas shown in the figure.
    G12188434Courtesy of MAZDA MOTORS CORP.

    Silicone sealant application diameter 

    5-10 mm {0.2-0.3 in}

  7. Set the cylinder head on the cylinder block.
  8. Tighten the cylinder head bolts in the order shown in the following 4 steps.
    Fig 1: Cylinder Head Bolts Tightening Sequence
    G11436516Courtesy of MAZDA MOTORS CORP.

    Tightening torque 

    Step 1: 13-17 N.m {133-173 kgf.cm, 116-150 in.lbf}

    Step 2: 43-47 N.m {4.4-4.7 kgf.m, 32-34 ft.lbf}

    Step 3: 85-95°

    Step 4: 85-95°

  9. Install the chain for the SST which was set aside and secure the engine.
  10. Remove the engine lifter or garage jack.
  11. Remove the temporarily assembled oil pan.