LEMON Manuals: Even more car manuals for everyone
Home >> Mazda >> 2022 >> CX-5 Turbo Signature >> Repair and Diagnosis >> External Pages >> Different variant/trim >> Section 15 (Engine Cooling System (VIN M)) >> Coolant Control Valve Removal/Installation >> Upper Radiator Hose Installation Note

Upper Radiator Hose Installation Note

WARNING: This page is about a different variant/trim than selected.
  1. Install the upper radiator hose using the following procedure:
    1. Tighten the bolt shown in the figure.
      G12184188Courtesy of MAZDA MOTORS CORP.

      Tightening torque 

      8-10 N.m {82-101 kgf.cm, 71-88 in.lbf}

    2. Connect the upper radiator hose to the coolant control valve so that the projection position is aligned with the mark.
    G12184197Courtesy of MAZDA MOTORS CORP.