LEMON Manuals: Even more car manuals for everyone
Home >> Mazda >> 2013 >> 5 Grand Touring >> Repair and Diagnosis >> External Pages >> Different car >> Section 72 (Instrument Panel) >> Instrument Cluster Finish Panel >> Removal and Installation

Removal and Installation

WARNING: This page is about a different car, the 2002 Mazda Tribute. However, it is still accessible from the selected car via links, so may be relevant.
  1. Disconnect the battery ground cable.
    Fig 1: Lowering The Glove Compartment
    G01144916Courtesy of MAZDA MOTORS CORP.
  2. Lower the glove compartment.
    1. Press the glove compartment release tabs inward while pulling downward on the glove compartment.
      Fig 2: Disconnecting Climate Control Cable
      G01144917Courtesy of MAZDA MOTORS CORP.
  3. Disconnect the climate control cable.
    1. Position the locator pin.
    2. Release the locking tab.
    3. Disconnect the climate control cable from the blend door shaft.
      Fig 3: Removing Instrument Cluster Finish Panel
      G01144918Courtesy of MAZDA MOTORS CORP.
  4. Remove the instrument cluster finish panel.
    1. Remove the screws.
    2. Remove the instrument cluster finish panel.
    3. Disconnect the electrical connectors.
  5. To install, reverse the removal procedure.