LEMON Manuals: Even more car manuals for everyone
Home >> Mazda >> 2013 >> 5 Grand Touring >> Repair and Diagnosis >> External Pages >> Different car >> Section 35 (Manual A/C-Heater Systems - HVAC) >> Air Conditioning Line (Peanut) Fitting >> Connect

Air Conditioning Line (Peanut) Fitting: Connect

WARNING: This page is about a different car, the 2002 Mazda Tribute. However, it is still accessible from the selected car via links, so may be relevant.
  1. Clean all dirt or foreign material from the fittings.
    Fig 1: Installing O-Ring Seal
    G01162162Courtesy of MAZDA MOTORS CORP.
    CAUTION:
    • Use only new purple O-ring seals. The use of any O-ring seals other than specified may result in intermittent leakage during vehicle operation.
  2. Install the O-ring seal.
    1. Lubricate the O-ring seals with PAG Refrigerant Compressor Oil (R-134a Systems).
  3. Lubricate the inside of the fittings with PAG Refrigerant Compressor Oil (R-134a Systems).
    Fig 2: Reassembling A/C Line Peanut Fitting
    G01162163Courtesy of MAZDA MOTORS CORP.
    NOTE:
    • When correctly assembled, the male and female fittings should be flush.
  4. Assemble the male and female fittings together.
  5. Charge the system. Refer to AIR CONDITIONING (A/C) SYSTEM EVACUATION AND CHARGING  .