Eccentric Shaft End Play Inspection
WARNING: This page does not describe the selected car, but rather 8 other vehicles, including the 2011 Mazda RX-8, 2010 Mazda RX-8, 2009 Mazda RX-8, 2008 Mazda RX-8, and 2007 Mazda RX-8. However, it is still accessible from the selected car via links, so may be relevant.
- Lock the flywheel (MT) or counterweight (AT) against rotation using the SST .
- Assemble the parts in the following order:
- Spacer
- Needle bearing
- Thrust plate
- Balance weight
- Oil pump drive gear
- Metering oil pump drive gear
CAUTION:- When assembling the spacer, do not allow the spacer to be caught in the needle bearing in the plate.
- Assemble the eccentric shaft pulley, eccentric shaft position plate, pulley boss component apply engine oil to the pulley lockbolt threads, and then tighten.
Tightening Torque
- 254-294 N.m {30.6-34.6 kgf.m, 188-215 ft.lbf}
- Remove the SST .
- Measure the end play of the eccentric shaft using a dial gauge.
- If not within the specification, replace the spacer with one that is thicker than the currently assembled one. If it exceeds the specification, replace with a thinner spacer.
Standard End Play
- 0.04-0.09 mm {0.0016-0.0035 in}
Maximum End Play
- 0.1 mm {0.0039 in}
SPACER TYPESMarking Dimension - (mm {in}) A 7.985 {0.3144} B 8.005{0.3152} C 8.025 {0.3159} D 8.045 {0.3167} E 8.065 {0.3175} NOTE:- If the end play is not within the specification even after replacing with an A-marked spacer, adjust by grinding it and reuse.