Fuel Injector (FP2, RP2) Operation Inspection
WARNING: This page is about a different car, the 2004 Mazda RX-8. However, it is still accessible from the selected car via links, so may be relevant.
- Connect the WDS or equivalent to the DLC-2.
- Warm up the engine and idle it.
- Monitor the following PID.
- Engine speed signal (RPM)
- Verify that there is no output of the fuel injector (FP2, RP2) control signal wave pattern from the following PCM terminals:
- PCM terminal 3A (FP2)
- PCM terminal 3D (RP2)
- If the signal wave pattern can be verified, inspect the following and repair or replace the malfunctioning part.
- Mass air flow sensor
- Throttle position sensor
- Intake air temperature sensor
- Verify that there is output of the fuel injector (FP2, RP2) control signal wave pattern from the following PCM terminals when the PID RPM is 6.250 RPM or more.
- PCM terminal 3A (FP2)
- PCM terminal 3D (RP2)
- If the signal wave pattern cannot be verified, perform the following inspections and repair or replace the malfunctioning location.
Fuel injector (FP2)
- Open or short circuit in the wiring harness between PCM terminal 3A and fuel injector (FP2) terminal B
- Open circuit in the wiring harness between fuel injector (FP2) terminal A and main relay terminal C
- Fuel injector short circuit (FP2)
Fuel injector (RP2)
- Open or short circuit between the PCM terminal 3D-fuel injector (RP2) terminal B
- Open circuit in the wiring harness between fuel injector (RP2) terminal A and main relay terminal C
- Open circuit in the fuel injector (RP2) internal circuit