LEMON Manuals: Even more car manuals for everyone
Home >> Mazda >> 2013 >> 5 Grand Touring >> Repair and Diagnosis >> Engine Mechanical >> Mechanical >> Engine Mechanical (Service Information MZR 2.5) >> Timing Chain Removal/Installation >> No.3 Engine Mount Installation Note

No.3 Engine Mount Installation Note

NOTE:
  • If the No.3 engine mount bracket and the engine are removed, retighten the No.3 engine mount stud bolts.
  1. Tighten the No.3 engine mount stud bolts.
    Fig 1: Identifying No.3 Engine Mount Stud Bolts
    G08151934

    Tightening torque 

    • 7-13 N.m {72-132 kgf.cm, 62-115 in.lbf}
  2. Temporarily tighten the No.3 engine mount installation bolts and nuts.
  3. Tighten the No.3 engine mount installation bolts and nuts in the order shown in the figure.
    Fig 2: No.3 Engine Mount Installation Bolts And Nuts Tightening Sequence With Torque Specifications
    G08151935