LEMON Manuals: Even more car manuals for everyone
Home >> Mazda >> 2013 >> 5 Grand Touring >> Repair and Diagnosis >> Electrical >> Charging Systems >> Charging System [MZR 2.5] >> Battery Removal/Installation [MZR 2.5] >> Battery Cover Installation Note

Battery Cover Installation Note

  1. Install with battery cover hooks A aligned with the battery tray holes at two points.
    Fig 1: Battery Cover
    G08150257
  2. Install with battery cover hooks D aligned with the battery tray flange at four points.
    Fig 2: Battery Cover Hooks D With Battery Tray Flange
    G08150258
  3. Set the battery cover to battery tray hooks C at two points.
    Fig 3: Setting Battery Cover To Battery Tray Hooks C At Points
    G08150259