Valve Clearance Adjustment
WARNING: This page is about a different variant/trim than selected.
- Follow the cylinder head gasket replacement procedure and remove the camshafts and camshaft sprocket as a single unit. (See CYLINDER HEAD GASKET REPLACEMENT .)
- Remove the tappet.
- Install an appropriate tappet based on the results of the valve clearance inspection.
- Selected tappet = Removed tappet thickness + Measured valve clearance - Standard valve clearance
Standard valve clearance [Engine cold]
- IN: 0.150-0.250 mm {0.00591-0.00984 in}
- EX: 0.300-0.400 mm {0.0119-0.0157 in}
- Install in the reverse order of removal.