Charging Preparation
WARNING: This page is about a different car, the 2009 Mazda 6. However, it is still accessible from the selected car via links, so may be relevant.
- Install the manifold gauge set
- Connect the tap pin side of the charging hose to the air purge valve of the manifold gauge
- Connect the vacuum pump hose to the center joint of the manifold gauge
- Connect the vacuum pump hose to the vacuum pump
- Connect the charging hose to the refrigerant tank
- Place the refrigerant tank on the scale.
Courtesy of MAZDA MOTORS CORP.
Regular amount of refrigerant (approx. quantity)
500-550 g {17.6-19.4 oz.}