PCM And Generator Shearing Inspection
WARNING: This page is about a different car, the 2009 Mazda 6. However, it is still accessible from the selected car via links, so may be relevant.
- Connect the M-MDS to the DLC-2.
- Inspect as follows:
GENERATOR INSPECTION CHART
| Step | Inspection | Action | |||||
|---|---|---|---|---|---|---|---|
| 1 | Measure the generator terminal B voltage when the electrical loads(1) are on and off. | 15 V or more | Go to Step 2. | ||||
| 13-15 V | Normal(2) | ||||||
| 13 V or less | Go to Step 3. | ||||||
| 2 | Monitor the ALTT V PID using the M-MDS, see
ON-BOARD DIAGNOSTIC TEST [L5]
. or measure the PCM 2AF terminal waveform using an oscilloscope. See
PCM INSPECTION [L5]
. Is the value normal? |
Yes | Go to Step 4. | ||||
| No | PCM input error. | ||||||
| 3 | Monitor the ALTT V PID using the M-MDS, see
ON-BOARD DIAGNOSTIC TEST [L5]
. or measure the PCM 2AF terminal waveform using an oscilloscope. See
PCM INSPECTION [L5]
. Is the value normal? |
Yes | Go to Step 5. | ||||
| No | PCM input error. | ||||||
| 4 | Monitor the ALTF PID using the M-MDS, or calculate the duty value of the PCM terminal 2AA using an oscilloscope. Is the duty value 100%? | Yes | PCM input error. | ||||
| No | PCM, generator, or both are not normal | ||||||
| 5 | Monitor the ALTF PID using the M-MDS, or calculate the duty value of the PCM terminal 2AA using an oscilloscope. Is the duty value 0%? | Yes | PCM input error. | ||||
| No | PCM, generator, or both are not normal | ||||||
|
|||||||