Normal Operation
NOTE:
- The smart junction box (SJB) is also known as the generic electronic module (GEM).
With the ignition switch in the START or RUN position, the instrument cluster receives voltage from the SJB/GEM through circuits (Y/O) and (V/GY). With the ignition switch in the OFF position, the instrument cluster receives its keep-alive voltage from the SJB/GEM through circuit (R). The instrument cluster is grounded through circuits (B/W) and (B/Y).
This pinpoint test is intended to diagnose the following:
- Fuse(s)
- Wiring, terminals or connectors
- Instrument cluster
CAUTION:
- Use the correct probe adapter(s) when making measurements. Failure to use the correct probe adapter(s) may damage the connector.
INSTRUMENT CLUSTER PINPOINT TEST 1
| PINPOINT TEST 1 | THE INSTRUMENT CLUSTER IS INOPERATIVE | ||
|---|---|---|---|
| STEP | INSPECTION | ACTION | |
| 1 | CHECK THE INSTRUMENT CLUSTER FOR VOLTAGE
|
Yes | Go to next step. |
| No | VERIFY the SJB/GEM fuses 9 (5A), 10 (10A), and 33 (5A) are OK. If OK, REPAIR the circuit(s) in question. TEST the system for normal operation. | ||
| 2 | CHECK CIRCUITS (B/Y) AND (B/W) FOR AN OPEN
|
Yes | Go to next step. |
| No | REPAIR the circuit(s) in question. TEST the system for normal operation. | ||
| 3 | CHECK FOR CORRECT INSTRUMENT CLUSTER OPERATION
|
Yes | INSTALL a new instrument cluster. See INSTRUMENT CLUSTER . TEST the system for normal operation. |
| No | The system is operating correctly at this time. The concern may have been caused by a loose or corroded connector. | ||
Chart 1
CONNECTOR-PIN SPECIFICATION (CHART 1)
| Connector - Pin | Circuit |
|---|---|
| 0922-101 - 8 | Y/O |
| 0922-101 - 10 | R |
| 0922-101 - 12 | V/GY |
Chart 2
CONNECTOR-PIN SPECIFICATION (CHART 2)
| Connector - Pin | Circuit |
|---|---|
| 0922-102-1 | B/Y |
| 0922-101 - 3 | B/W |