Pinpoint Test 2: DTC C1186-Abs Power Relay Output Open Circuit And B1317 And B1318- Battery Voltage High/ Battery Voltage Low.
Normal Operation
Fused battery voltage is sent from battery junction box (BJB) fuses 33 (30A) and 17 (40A) to the anti-lock brake system (ABS) module along circuits (R) and (Y/LG) respectively. Fused ignition voltage is sent from smart junction box (SJB) fuse 20 (10A) to the ABS module along circuit (R) and 2 grounds are provided for the module along circuit (B). Operating voltage for the ABS module is normally between 10 and 17 volts.
Possible Causes
- Fuse(s)
- Circuit open
- Vehicle battery
- Charging system
- ABS module
CAUTION:
- Use the Flex Probe Kit for all test connections to prevent damage to the wiring terminals. Do not use standard multimeter probes.
NOTE:
- DTC B1317 and B1318 are generated when the anti-lock brake system (ABS) module detects system voltage is less than 9 volts or greater than 19 volts for more than 1 second.
PINPOINT TEST 2 CHART - DTC C1186 - ABS POWER RELAY OUTPUT OPEN CIRCUIT AND B1317 AND B1318 - BATTERY VOLTAGE HIGH/ BATTERY VOLTAGE LOW
| PINPOINT TEST 2 | DTC C1186-ABS POWER RELAY OUTPUT OPEN CIRCUIT AND B1317 AND B1318- BATTERY VOLTAGE HIGH/ BATTERY VOLTAGE LOW | ||
|---|---|---|---|
| STEP | INSPECTION | ACTION | |
| 1 | CHECK RECENT VEHICLE HISTORY
|
Yes | Go to next step. |
| No | The system is operating normally at this time. | ||
| 2 | CHECK THE BATTERY VOLTAGE
|
Yes | Go to next step. |
| No | See SYMPTOM TROUBLESHOOTING CHART - CHARGING SYSTEM . | ||
| 3 | CHECK THE CHARGING SYSTEM
|
Yes | Go to next step. |
| No | See SYMPTOM TROUBLESHOOTING CHART - CHARGING SYSTEM . | ||
| 4 | CHECK CIRCUIT (R) FOR VOLTAGE
|
Yes | Go to next step. |
| No | Verify smart junction box (SJB) fuse 20 (10A) is OK. If OK, repair circuit (R) for an open. Clear the DTCs. Carry out the self-test with the brake pedal not applied. | ||
| 5 | CHECK CIRCUIT (R) FOR VOLTAGE
|
Yes | Go to next step. |
| No | Verify battery junction box (BJB) fuse 33 (30A) is OK. If OK, repair circuit (R) for an open. Clear the DTCs. Carry out the self-test with the brake pedal not applied. | ||
| 6 | CHECK CIRCUIT (Y/LG) FOR AN OPEN
|
Yes | Go to next step. |
| No | Verify BJB fuse 17 (40A) is OK. If OK, repair circuit (Y/LG) for an open. Clear the DTCs. Carry out the self-test with the brake pedal not applied. | ||
| 7 | CHECK CIRCUIT (B) FOR AN OPEN
|
Yes | Go to next step. |
| No | Repair circuit (B) for an open. Clear the DTCs. Carry out the self-test with the brake pedal not applied. | ||
| 8 | CHECK FOR CORRECT ABS MODULE OPERATION
|
Yes | Install a new ABS module. See ANTI-LOCK BRAKE SYSTEM (ABS) MODULE . Test the system for normal operation. |
| No | The system is operating correctly at this time. Concern may have been caused by a loose or corroded connector. Clear the DTCs. Carry out the self-test with the brake pedal not applied. | ||