Normal Operation
With the ignition switch in the START or RUN position, the instrument cluster receives voltage from the smart junction box (SJB) through circuits (R/Y), and (P/B). With the ignition switch in the OFF position, the instrument cluster receives its keep-alive voltage from the SJB through circuit (B/LG). The instrument cluster is grounded through circuits (B) and (B/W).