Assembly procedure
WARNING: This page is about a different variant/trim than selected.
- Measure the spring free length.
Secondary control valve body spring (standard)
SECONDARY CONTROL VALVE BODY SPRING SPECIFICATIONSItem Outer diameter mm {in} Free length mm {in} No. of coils Wire diameter mm {in} 4-5 shift valve spring 8.7 {0.343} 27.0 {1.063} 10.7 0.8(0.031} - If not as specified, replace the springs.
- Install the 4-5 shift valve B, 4-5 shift valve A, 4-5 shift valve spring and retainer.
- Install the tubular pins into the secondary main control valve body.
CAUTION: Do not confuse gaskets G and H.
- Set the new gasket H, separator plate, and new gasket G on the secondary main control valve body.
- Set the secondary lower control valve body onto the secondary main control valve body.
- Tighten the bolts evenly and gradually in the order shown.
Tightening torque
7.8-10.8 N.m {80-110 kgf.cm, 69-95.5 in.lbf}
- Measure the spring free length.
Secondary control valve body spring (standard)
SECONDARY CONTROL VALVE BODY SPRING SPECIFICATIONSItem Outer diameter mm {in} Free length mm {in} No. of coils Wire diameter mm {in} 4/5 accumulator large spring 21.2 {0.835} 72.2 {2.843} 14.0 2.6 {0.102} 4/5 accumulator small spring 15.2 {0.598} 53.7 {2.114} 11.9 3.2 {0.126} - If not as specified, replace the springs.
- Install the 4/5 accumulator, 4/5 accumulator small spring and 4/5 accumulator large spring.
- Install the 4/5 accumulator plate.
Tightening torque
7.8-10.8 N.m {80-110 kgf.cm, 69-95.5 in.lbf}
- Install the shift solenoid F and pressure control solenoid B.
Tightening torque
7.8-10.8 N.m {80-110 kgf.cm, 69-95.5 in.lbf}
- Install the bracket.
Tightening torque
7.8-10.8 N.m {80-110 kgf.cm, 69-95.5 in.lbf}