Circuit Open/Short Inspection
WARNING: This page is about a different variant/trim than selected.
- Disconnect the PCM connector. (See PCM REMOVAL/INSTALLATION ).
- Inspect the following wiring harnesses for an open or short circuit (continuity check).
Open circuit
- If there is no continuity, there is an open circuit. Repair or replace the wiring harness.
- Purge solenoid valve terminal B and PCM terminal 4T
- Purge solenoid valve terminal A and main relay terminal C
Short circuit
- If there is continuity, there is a short circuit. Repair or replace the wiring harness.
- Purge solenoid valve terminal B and body Ground
- Purge solenoid valve terminal A and power supply