No Communication With The SJB
PINPOINT TEST 5 - NO COMMUNICATION WITH SJB
| PINPOINT TEST 5 | NO COMMUNICATION WITH THE SJB | ||
|---|---|---|---|
| STEP | INSPECTION | ACTION | |
| 1 | CHECK POWER TO THE SJB
|
Yes | Go to step 2. |
| No | Repair the circuit or circuits in question. Test the system for normal operation. | ||
| 2 | CHECK SJB GROUND CIRCUITS
|
Yes | Replace the SJB. See SMART JUNCTION BOX (SJB) REMOVAL/INSTALLATION . Test the system for normal operation. |
| No | Repair the circuit. Test the system for normal operation. | ||