Illumination Inoperative - Climate Control
PINPOINT TEST 3 - ILLUMINATION INOPERATIVE - CLIMATE CONTROL
| PINPOINT TEST 3 | ILLUMINATION IS INOPERATIVE - CLIMATE CONTROL | ||
|---|---|---|---|
| STEP | INSPECTION | ACTION | |
| 1 | CHECK FOR POWER TO THE CLIMATE CONTROL
|
Yes | Go to step 2. |
| No | Repair the circuit. Test the system for normal operation. | ||
| 2 | CHECK FOR GROUND AT THE CLIMATE CONTROL
|
Yes | Replace the illumination bulbs. See INSTRUMENT CLUSTER ILLUMINATION BULBS REMOVAL/INSTALLATION . Test the system for normal operation. |
| No | Repair the circuit. Test the system for normal operation. | ||