Resistance Inspection
- Remove the APV motor. (See INTAKE-AIR SYSTEM REMOVAL/INSTALLATION .)
- Measure the resistance between the APV motor terminals using an ohmmeter.
- If not as specified, replace the APV motor. (See INTAKE-AIR SYSTEM REMOVAL/INSTALLATION .)
- If as specified, carry out the "Circuit Open/Short Inspection".
APV motor resistance 8-50 ohms