LEMON Manuals: Even more car manuals for everyone
Home >> Mazda >> 2002 >> Tribute LX, 4WD >> Repair and Diagnosis >> External Pages >> Different car >> Section 260 (Engine Mechanical - Overhaul) >> Main Bearing Replacement >> Installation >> High Power

High Power

WARNING: This page does not describe the selected car, but rather 8 other vehicles, including the 2011 Mazda RX-8, 2010 Mazda RX-8, 2009 Mazda RX-8, 2008 Mazda RX-8, and 2007 Mazda RX-8. However, it is still accessible from the selected car via links, so may be relevant.
  1. Temporarily assemble the stationary gear and the main bearing so that the main bearing screw hole and the stationary gear screw hole are aligned after pressing in the main bearing and rotor.
    Fig 1: Identifying Oil Hole & Stopper Screw Hole
    G02831016Courtesy of MAZDA MOTORS CORP.
  2. Remove the SST  handle.
    Fig 2: Removing SST Handle
    G02831017Courtesy of MAZDA MOTORS CORP.
  3. Position the gear of the stationary gear downward, and install the main bearing using the SST  .
    CAUTION:
    • Press the main bearing in so that the top of the main bearing is flush with the top of the stationary gear flange.
    Fig 3: Pressing Main Bearing
    G02831018Courtesy of MAZDA MOTORS CORP.
  4. Apply thread-locking compound to the stopper screw and install.

    Tightening Torque 

    1. 3.2-4.7 N.m {33-47 kgf.cm, 29-41 in.lbf} 
    2. Fig 4: Installing Stopper Screw
      G02831019Courtesy of MAZDA MOTORS CORP.