LEMON Manuals: Even more car manuals for everyone
Home >> Mazda >> 2002 >> Tribute LX, 4WD >> Repair and Diagnosis >> External Pages >> Different car >> Section 15 (Engine Mechanical) >> Removal & Installation >> Intake Manifold >> Installation

Intake Manifold: Installation

WARNING: This page is about a different car, the 2001 Mazda MPV and 2000 Mazda MPV. However, it is still accessible from the selected car via links, so may be relevant.
  1. To install fuel injectors, install NEW "O" rings on fuel injector. Coat "O" rings with engine oil. Using twisting motion, install fuel injector into fuel rail so notch on side of fuel injector engages notch in fuel rail.
  2. Install NEW insulators and "O" rings onto fuel rail. Install and tighten retaining bolts to specification. See TORQUE SPECIFICATIONS . To install remaining components, reverse removal procedure. Install all intake manifold retaining bolts and nuts before tightening to specification. Tighten intake manifold bolts in order. See Fig 2 Tighten all fasteners evenly to specification. See TORQUE SPECIFICATIONS .
  3. Fill and bleed cooling system. See COOLING SYSTEM BLEEDING . Ensure accelerator cable has .06-.16" (1.5-4.1 mm) deflection at throttle body when installed. If deflection is not as specified, rotate nut on end of cable at throttle body until specified deflection is obtained.
Fig 1: Exploded View Of Intake Manifold & Related Components
G00014141Courtesy of MAZDA MOTORS CORP.
Fig 2: Intake Manifold Bolt Tightening Sequence
G00014143Courtesy of MAZDA MOTORS CORP.