Hardwired Inputs
The IPC requires hardwired inputs from components that are not on either the HS-CAN or the MS-CAN. These components are required for specific IPC functions or gateway requirements. For additional information about the gateway function, Refer to GATEWAY FUNCTION .
The hardwired inputs are provided by:
- Fuel pump assembly (primary fuel level input)
- Fuel level sensor (secondary fuel level input)
- Park detect switch (part of the floor shifter assembly)
- Washer fluid level switch